Contract no.: 02/2017-18
Location: Chittagong City Outer Ring Road
Fund Authority: Japan International Cooperation Agency (JICA)
Contract Value:
Along with the Chittagong Ring Road Project itself, Spectra Engineers Limited is also working on the Construction of Feeder Road and the Beautification Work under the principal project.
To link with the City Outer Ring Road, three feeder roads are planned to be built. Through this road, vehicles from the city will be able to access the ring road. Feeder Road-1 connects the Patenga Steel Mill area to the Narikeltala embankment. From Barapul via Anandabazar, Feeder Road-2 will connect near the embankment. And through Sagarika, Feeder Road-3 which also includes a flyover, will ascend to the embankment. Leveraging a team of highly professional and talented engineers, and well-equipped workforce, the road will offer maximum benefits to everyone.